Eco construction

Return

Murs en béton de chanvre sur ossature bois XXXXXXXXXXX

For this project, hemp concrete was applied the wood frame of the building to create insulating hemp walls. The hemp solution was used by the company ARB Vieille Brioude to make 40 cm thick walls.


Project managers: 
Société ARB - Zone Artisanale - 43100 Vieille-Brioude
Tel.: 04 71 74 85 38 - http://www.renovation-43.fr/


Architect: 
Alexis Monjauze - 44, chemin Sainte Catherine - 43000 Le Puy en Velay
Tel.: 04 71 02 82 95 - http://maison-biologique-en-haute-loire.over-blog.com/


Date and location of the project: 
Maison Lafon, Chemin de la croix de pluie à Langeac (43) – July 2010

Diaporama

DSC_0157
IMGP0141 IMGP0197 IMGP0198 IMGP0200 IMGP0201 IMGP0203 IMGP0208 IMGP0211 IMGP0214 IMGP0261 IMGP0265 IMGP0268 IMGP0269 IMGP0272

Launch slideshow